Marine repair and maintenance

Ships and tugs, back in the water on schedule

Hull maintenance, equipment installation, propulsion and hydraulic overhaul, and complete shaft line work on ships and tugs.

Container vessel alongside gantry cranes at a commercial port berth

Services

  • Sand blasting and grit blasting
  • Paint schemes applied to ISO standards
  • Fabrication of hull sections
  • Renewal of sacrificial anodes
  • Welding assistance

  • New equipment fitment in vessels
  • Contract installation with trained technicians
  • Delivery to the yard's schedule

  • Hydraulic system overhaul
  • Propulsion system overhaul
  • Work carried out during major shutdowns

Systems and brands

  • Voith

  • Servo motors
  • Shaft line
  • Main shaft seals and blade shaft seals
  • Gearboxes
  • Hydraulic systems, associated valves, gear pumps and pipelines
Ref
marine-repair-maintenance
Sector
marine
Operating since
2015
Services
4

How the work runs

The stages specific to this discipline. The firm-wide sequence, from enquiry through to support after handover, is on the home page.

  1. Survey alongside or in dock

    The vessel is examined where it sits. Hull condition, anode state and the condition of the propulsion and hydraulic systems decide what the scope actually is, which is rarely what the original enquiry said it was.

  2. Scope and window agreed against the docking plan

    Marine work is bounded by the dock window, not by the task list. The scope is set against the date the vessel has to be back in the water, and anything that will not fit is said so before the job starts.

  3. Strip down and blast

    Systems are opened up and hull surfaces are sand or grit blasted back to the specified standard, which is the point at which the real condition of the steel becomes visible.

  4. Overhaul, renew, fabricate

    Shaft lines, seals, gearboxes, servo motors, valves and gear pumps are overhauled or renewed. Hull sections are fabricated where plate has to be replaced, and sacrificial anodes are renewed.

  5. Paint scheme to the specified standard

    The protective and paint scheme is applied to ISO standards. On a hull this is the element that determines how the work looks in twelve months, not on handover day.

  6. Reassembly, alignment and trials

    Systems are closed up and the shaft line aligned before the vessel goes back to work. Where installation of new equipment is in scope, technicians trained on that system do the fitting.

Technical expertise

  • Complete shaft line overhaul: servo motors, main and blade shaft seals, gearboxes
  • Voith propulsion system overhaul during major shutdowns
  • Hydraulic systems, associated valves, gear pumps and pipelines
  • Sand and grit blasting, and hull section fabrication
  • Sacrificial anode renewal and welding support
  • Paint schemes applied to ISO standards

What you get

The dock window holds
Scope is agreed against the docking plan rather than discovered halfway through it, so the date the vessel is due back is a date rather than an aspiration.
One contractor across hull and machinery
Blasting, fabrication, propulsion, hydraulics and shafting sit with one firm, so nobody is waiting on a second contractor to finish before they can start.
Trained fitting, not general labour
New equipment is installed by technicians trained on the system concerned, which is the difference between a warranty that survives commissioning and one that does not.

From the work

  • A tug sitting on blocks in dry dock during hull maintenance
  • Blue-painted propulsion machinery in a vessel's engine room
  • Technician working on a stripped propulsion shaft assembly
  • Installed marine machinery and pipework inside a ship's machinery space
  • Crew handling a large machined flange during a tug overhaul

Delivered for

  • Indian Navy

    Indigenisation of equipment and spares, ship maintenance, custom fabrication, and combustion control systems at naval establishments.

  • Indian Coast Guard

    Marine repair and equipment work on service vessels.

  • Goa Shipyard Limited

    Engineering support on new build and refit programmes.

Questions

Can you work during a dry-dock or shutdown window?
Yes. That is when most of the overhaul work happens. Shaft line, hydraulics, propulsion and hull work are sequenced to fit the window the yard has given.
Can you handle hull work and machinery work under one contract?
Yes, and that is usually the point. Blasting, hull fabrication, anode renewal, propulsion, hydraulics and the shaft line all sit with one firm, so no crew is waiting for a second contractor to clear the space.
What happens if the hull is worse than the survey suggested?
It is reported before it is worked on, with what it does to the scope and to the window. Hull condition is not fully known until the surfaces are blasted back, and pretending otherwise at quotation stage is how a dock window gets lost.