Power · Cabling

HT and LT power cable laying

Laying of high and low tension power cables and the supporting infrastructure across distribution routes.

  • Manufacturing
Power cable being drawn from drums during a distribution install

Brief

Cable is the least visible part of a distribution job and the most expensive to get wrong: a fault found after backfill costs more than the cable did.

Approach

  1. Route survey and trenching.
  2. Draw cable from drums and lay to route.
  3. Terminate, test and reinstate.
Ref
ht-lt-cable-laying
Sector
power

Gallery

  • Power cable being drawn from drums during a distribution install
  • HT power cable drums staged at a distribution site
  • Cable trays and conduit runs through an industrial plant room

How this was run

The same seven stages carried this project as carry every requirement here, from the first enquiry through to support after handover. Select a stage to see what happens in it.

You send what you have

A drawing, a photograph of the part, or a description of the fault. Any one of the three is enough to start. Requirements here arrive that way far more often than as a product order.

Hands over: Drawing, photograph or fault report

Stage 1 of 7. Every stage happens on every job; how long each takes is what changes.