Power · Cabling
HT and LT power cable laying
Laying of high and low tension power cables and the supporting infrastructure across distribution routes.
- Manufacturing

Brief
Cable is the least visible part of a distribution job and the most expensive to get wrong: a fault found after backfill costs more than the cable did.
Approach
- Route survey and trenching.
- Draw cable from drums and lay to route.
- Terminate, test and reinstate.
- Ref
- ht-lt-cable-laying
- Sector
- power
Gallery
How this was run
The same seven stages carried this project as carry every requirement here, from the first enquiry through to support after handover. Select a stage to see what happens in it.
You send what you have
A drawing, a photograph of the part, or a description of the fault. Any one of the three is enough to start. Requirements here arrive that way far more often than as a product order.
Hands over: Drawing, photograph or fault report
Stage 1 of 7. Every stage happens on every job; how long each takes is what changes.